Insulation always takes longer than you think



100mm of kingspan insulation throughout, 1000guage DPM above.
Started this and then Neil finished on his own. Took three times as long to lay the insulation as expected. Installed 2 electronics ducts and an electric circuit.
Posted by Kieran at 11:53 pm

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2009 (27)
    • ►  June (1)
    • ►  May (1)
    • ►  March (2)
    • ►  February (11)
    • ►  January (12)
  • ▼  2008 (135)
    • ►  December (8)
    • ►  November (11)
    • ▼  October (9)
      • Underfloor Heating from Nuheat
      • Slump Test and the Slump Cone
      • Insulation always takes longer than you think
      • Sliding door base
      • Dustroofing concrete
      • Broken into
      • Flue installation
      • External images
      • Internal images
    • ►  September (13)
    • ►  August (17)
    • ►  July (19)
    • ►  June (25)
    • ►  May (7)
    • ►  April (9)
    • ►  March (4)
    • ►  February (3)
    • ►  January (10)
  • ►  2007 (80)
    • ►  December (7)
    • ►  November (9)
    • ►  October (3)
    • ►  September (2)
    • ►  August (1)
    • ►  July (2)
    • ►  June (2)
    • ►  May (5)
    • ►  April (2)
    • ►  March (20)
    • ►  February (11)
    • ►  January (16)
  • ►  2006 (46)
    • ►  December (11)
    • ►  November (14)
    • ►  October (10)
    • ►  September (4)
    • ►  August (3)
    • ►  June (4)

Our pratice website

  • Konishi Gaffney architects