Tuesday, December 23, 2008
Thursday, December 18, 2008
Sliding doors in construction
Tuesday, December 16, 2008
Kotatsu table legs
Saturday, December 13, 2008
Staircase: stringers water cut, saw cut treads and risers (Stewart & Kieran), assembled by Clare Slifer and Kieran Gaffney
Saturdays are my favourite days on site, because there are no distractions, no deliveries or phone calls to make it is just sold work all day. Today Clare and I assembled the stairs and fixed them in place, a big job that I am very happy to have done. Water cut plywood stringers supplied by JetCut in Glasgow for the princely sum of £200.
Friday, December 12, 2008
Plasterboarding is a difficult job
Bathroom going in
Curved ceiling
Saturday, December 06, 2008
Luck like you wouldn't believe (drain connection)
The full story of the drain connection is the subject of a long and lucky story. The short story is that I am the luckiest builder on earth for 4 reasons
1. The water main was 2 mm above our drain pipe
2. The street drainage pipe was 0.2mm above our drain pipe
3. The connection point of the drain was exactly 80mm below our 8m run (giving us our 1:100 fall by the skins of our teeth.
4. No sooner had we filled in our trench with type 1 hardcore but the "water man" turned up and agreed to tarmac the trench at a great saving.
I am grateful. And to Hall Mossman my groundworks contractor, many thanks!
We are now fully connected to water, electricity and gas. The heating is on!